Reply within 1 to 2 working daysNo subscriptionOur own software licences
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhinoDWG, DXF, RVT, STEP and every common CAD format
Our material schedules service is a concrete work package that we at OutsourceCAD regularly take over from clients who lack the drafting capacity to keep such an overview up to date themselves. A material schedule looks simple, a list of components, dimensions and quantities, but on a larger project it quickly becomes error-prone once someone maintains it by hand alongside a model that keeps changing.
That is why, wherever possible, we build with parametric Revit families, smart components where the material schedule automatically follows the model.
If a component changes, the schedule changes with it, without anyone having to update it by hand. Our team consists of drafters with more than ten years of CAD experience, led by Sam, our team leader, who has a background of more than fifteen years in architecture. We work with the latest versions of Revit, AutoCAD and Rhino, and deliver in the format you need further down the process.
Cable tray routing in the model, built with parametric families that carry the material schedule with them.
01
From First Conversation to Delivered Material Schedules
The process starts with a conversation in which you provide the details, and usually also existing drawings or an existing model that the material schedule needs to match. From that, we can see how many components there are, how much repetition they involve and whether the model is already built parametrically or is still entirely static. We then deliver in stages, so you do not receive a complete overview all at once at the end of the project without any interim checks. After a first partial delivery, you give feedback, after which we make adjustments and carry on.
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.
That prevents a wrong assumption about a component from only surfacing late in the process. We agree the consultation rhythm with each client, sometimes every two days, sometimes weekly, depending on how fast the project needs to move. Files usually go back and forth by email. On larger projects, for example in greenhouse construction, we use software that you can log into to follow the progress of the project. Day-to-day contact takes place by email, phone and meetings, and where needed we visit you or you visit us, although the work itself is carried out remotely.
The work passes through at least three review layers before we deliver: a drafter works out the schedule, a second team member checks it, Sam then reviews it as team leader, and Barry, our project manager, carries out the final check. That keeps the number of errors in an extensive material schedule to a minimum in practice. This way of working also holds up on an ongoing project that changes shape along the way, so an interim change does not mean starting all over again.
Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Software and Formats for Our Material Schedules Service
Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.
We mainly build material schedules from Revit, supplemented by AutoCAD and Rhino where the project calls for it. We also work with Inventor and Grasshopper and, to a limited extent, Dynamo and Vault. We always use the latest versions of these packages, so the schedule ties in well with what you use yourself. We deliver in Revit formats, but also in DXF, DWG or STEP, and in practice almost any common CAD format.
We work in our own environment with our own licences, not in yours, so no time is lost setting up an unfamiliar workstation before the real work begins. We follow your standard and drawing conventions, not a fixed template of our own, so the schedule fits straight into the existing set. If an existing model relies on an outdated or cluttered family set, we first assess whether cleaning it up is enough or whether rebuilding is quicker. If the existing set is very messy, rebuilding is sometimes faster than repairing, even though it feels like a bigger first step.
With a material schedule in particular, this is an important trade-off, because a messy family set quickly produces an unreliable schedule, however carefully the drafter works otherwise. We discuss which approach is appropriate in the first conversation, based on the files you supply. That way you do not have to judge for yourself whether an old family set is still usable, because we look at that up front.
Our own office with our own licences: nothing needs to be set up or released on your side.
No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.
A material schedules project can vary considerably in size, from a single overview for a small component to an extensive schedule for a complete piping system or a large installation. With our large, flexible team, we therefore scale up or down per project, depending on what the work requires. We do this with people from our existing, permanent team, not by hiring someone new for the occasion. Everyone involved has more than ten years of CAD experience, so new people get up to speed on a project quickly without a long induction period. When things are urgent, we add extra capacity immediately, so a peak in your drawing office does not automatically lead to delays. If someone drops out due to illness or holidays, we replace that person so the project keeps running. You pay no ongoing payroll costs for that replacement, which is a clear difference from having your own permanent drafter.
When a deadline could not slip, we have in practice worked through evenings and weekends, with days of fourteen to fifteen hours, to hit a delivery date, even during a planned holiday of Sam's. That kind of commitment is not a standard promise for every project, but it shows that we adapt when the situation calls for it. If you expect a material schedule to grow as the project progresses, it is best to discuss that in advance so we can have the right capacity ready in time. If the scope still turns out to be larger than expected during the project, we simply discuss it in the ongoing consultations, without you having to arrange anything separately.
Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side
You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.
Getting Started With Our Material Schedules Service
We start as soon as enough information is available, usually after a first conversation in which you provide the details and the existing model or drawings. We respond to a new enquiry within 1 to 2 working days, so you quickly know where you stand. It helps to have a picture in advance of how many components there are, whether the model is already built parametrically, and which standard and drawing conventions apply.
Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.
If that information is still missing, we simply go through it together in the first conversation. A short first assignment is possible, so you can assess our speed and accuracy before we agree on a larger project.
Case study: Firefly
We charge by the hour or per project at a fixed price, billing only net working hours, and we decide together which form suits best. The intellectual property of the delivered material schedule belongs to you. So far we have not signed a non-disclosure agreement, because clients have not asked for one before, but we are open to it if you request one.
As soon as the first documents are in, we can actually get started, without first having to recruit or train anyone. That way, if you have a cluttered family set or an outdated schedule, you do not have to tidy everything up yourself before the work can start. We simply include cleaning up or rebuilding that set as part of the first piece of work we deliver.
FAQ
Frequently asked questions about our material schedules service
It involves drawing up or maintaining an overview of components, dimensions and quantities, linked to a drawing or model. Wherever possible, we build this parametrically, so the schedule automatically follows changes to the model. If a component changes, the schedule changes with it, without anyone having to update it by hand. We work in Revit, AutoCAD or Rhino, using the latest versions of these packages. We deliver in the format you need, such as DXF, DWG, Revit formats or STEP. The work passes through at least three review layers before we deliver. That keeps the number of errors in the schedule to a minimum in practice. We decide exactly what is needed in the first conversation.
With a parametric model, we build a component once as a smart Revit family and then place it in every variant. The material schedule is linked to it and changes automatically as soon as the component changes. With a static model, someone has to check manually after every change whether the schedule is still correct, which is error-prone. A familiar example is a valve that comes in size 90 and size 110, where a smart family stops the schedule and the drawing from drifting apart.
That saves at least seventy percent of the time compared with maintaining everything by hand. Not every existing model is set up this way yet. If an existing family set is messy, rebuilding is sometimes faster than repairing. We look at which approach is appropriate on a project-by-project basis.
Yes, we work to the standard and drawing conventions you supply, not to a fixed template of our own. That applies to the layout of the schedule, the naming of components and the way we present quantities. We deliver in the format that suits your next process, such as DXF, DWG, Revit formats or STEP. If an existing model relies on an outdated family set, we first assess whether cleaning it up is enough or whether rebuilding is needed.
We work in our own environment with our own licences, not in yours. We discuss how the work will tie in with existing files in the first conversation. That way there is no separate conversion step between what we deliver and what you already use internally. It saves hassle afterwards.
Yes, our large, flexible team scales with each project, from one drafter to as many drafters as the work requires. We do this with people from our existing, permanent team, not by hiring someone new for the occasion. Everyone involved has more than ten years of CAD experience, so new people get up to speed quickly. When a project grows, we do not have to wait for recruitment, because the capacity is already there.
If someone drops out due to illness or holidays, we replace that person so the project keeps running. Our quality control, with at least three review layers, remains in place with a larger team too. An early conversation about the expected scope helps us have capacity ready in time. That way, growth during the project need not lead to delays.
A cluttered family set often comes about because components have been added for years without any tidying up, which makes the material schedule unreliable. In that case, we first assess whether cleaning it up is enough or whether rebuilding is quicker. If the set is very messy, rebuilding is sometimes faster than repairing. When cleaning up, the basis of the model stays intact, whereas when rebuilding we set up the components parametrically from scratch.
Both routes lead to a schedule that reliably follows the model again. Which choice is wiser depends on the state of the existing set. We assess that in the first conversation, based on the files you supply. That way we avoid spending time repairing something that would be better rebuilt.
We charge by the hour or per project at a fixed price, and we decide together which form suits best. With hourly work, we only bill net working hours, with no room for time not spent directly on the schedule. With a fixed project price, the amount is set in advance, regardless of minor changes during the work. What keeps costs down above all is whether the model is already built parametrically or still works statically.
With a parametric model, updating the schedule takes less time than with a manual list. We do not work with prepaid hour bundles or a monthly hours subscription. You pay no ongoing payroll costs, not even in quiet periods. We give you a concrete estimate after the first conversation.
It helps to have a picture of the number of components, whether the model is already built parametrically, and which standard and drawing conventions apply. We are glad to receive existing drawings or an existing model that serve as a basis at the first conversation. If that information is still missing, we simply go through it together, without you having to supply everything ready-made. We get back to you on an enquiry within 1 to 2 working days.
As soon as there is enough information, we start, without first having to recruit anyone. A short first assignment is a great way to assess our approach. The intellectual property of the delivered work belongs to you. That way the project starts without unnecessary delay.
We respond to a new enquiry within 1 to 2 working days, followed by a first conversation. As soon as you have supplied enough information, we get straight to work, because our core team is already in place. When things are urgent, we immediately add extra capacity from our large, flexible team. After that, we deliver in stages, so you do not have to wait weeks for a complete overview.
How quickly the first material schedule is ready depends on the size of the model and how much existing material needs cleaning up. On a small, well-organised project that goes faster than with a cluttered set. We give you a concrete estimate after the first conversation, once the documents supplied are known. That conversation is the logical starting point.