OutsourceCAD

Rent an Inventor Drafter

Rent an Inventor drafter for parts, assemblies and revision rounds

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

If you want to rent an Inventor drafter, you usually have a specific pile of work in mind. A series of parts that someone needs to model, an assembly that has to be drawn up, or a set that no longer matches reality after changes on the workshop floor. That is the kind of work we take on.

We draft and model; we do not do engineering and we do not carry out calculations. Every one of our drafters has more than ten years of CAD experience and works from our own office on our own licences.

We follow your drawing conventions and deliver in the formats your supply chain can handle. The process starts with a conversation in which we go through the documents and decide which part of the work suits us. After that, we deliver in stages, gather your feedback and carry on. We respond to a new enquiry within 1 to 2 working days, even if it is only an exploratory question. And we will tell you honestly whether the work suits us or whether you are better off keeping it in-house.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

When it makes sense to rent an Inventor drafter

Outsourcing is not always the right answer, and we would rather say so beforehand than afterwards. It works well for volume, for repetition and for work with a clear brief. A series of variants of the same part, a revision pass across dozens of drawings or an as-built file that needs to be checked properly: that is where we bring speed when your own team no longer can. It also works well during a peak. The drawing office is running at full capacity, another project comes in, and nobody wants to take on a permanent employee who will have nothing to do in four months.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

Outsourcing makes less sense for work that is still very much in flux, where decisions change every day. Coordination then costs more than the drafting itself, and you are better off keeping it with your own people for a while until the direction is settled. The same goes for work that is closely intertwined with engineering, because we do not do that. We do not run calculations and we do not give structural advice. If you are unsure where that line lies, we go through it in the first conversation and tell you honestly where we add value.

A third consideration is the standard. If it is fixed internally and we can get hold of it, we can start drawing to those conventions almost immediately. If it is missing altogether, it first takes some time on both sides to pin it down. In that case, we prefer to take on a small part first and present it to you, rather than producing a hundred drawings straight away based on an assumption. That way, any difference of opinion surfaces early.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

The cost side of renting an Inventor drafter

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

The work is billed by the hour or per project at a fixed price. We decide together which arrangement fits best, and that mainly depends on how precisely the scope can be defined upfront. A well-defined job with a known number of drawings and a clear standard lends itself to a fixed price, because both sides then know where they stand. Work that is still changing we prefer to bill by the hour. With a fixed price, a margin for uncertainty would inevitably creep in, and you would end up paying for that margin without anyone benefiting from it.

We only bill actual working hours. If a team member steps away for five minutes to get a coffee, the clock stops. That sounds strict, but it is the only way to deliver a timesheet nobody argues about. What further keeps costs down is the input you supply. Complete documents, a clear standard and usable source files save us detective work, and detective work is the most expensive part of drafting.

Repetition also lowers costs, because the more often a part recurs in the same form, the less time each subsequent version takes. You carry no ongoing payroll costs with us, because we only deploy what the project needs and take people off as soon as the volume drops. We do not work with prepaid hour bundles or a monthly hours subscription. For an estimate, we go through the documents together and point out which parts will take the most time. If the scope turns out smaller along the way, we bill fewer hours rather than the amount that was once mentioned.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

Who we do this drafting work for

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

We work for engineering firms, architectural practices, contractors and manufacturers, and more broadly for companies with technical drafting work. The people at the table are managers, team leaders and owners: people who see for themselves what is piling up and who can make a decision about it. The reason is almost always the same. There is too little time, there are too few drafters, or a peak comes along that the in-house team cannot handle. Sometimes there is also a vacancy that simply will not get filled, and then renting a drafter is just faster than waiting. We are based in the Netherlands and our focus is on the Netherlands, so discussions take place in the same language and within the same working day. We started this service last year because a client asked for it. It went well, and we have offered it as a standard service ever since.

For Firefly, we have now completed more than twenty projects and hundreds of drawings, including a file in which the existing drawings had been printed incorrectly and were partly drawn by hand. We sorted that out ourselves instead of calling the client every day, and still delivered it neatly. We do not have public reviews yet, and we are not going to make any up. What we can offer is a small first assignment on which a new client can judge our speed and accuracy. In practice, that says more than a page of stories about ourselves. If that first job goes well, we expand to more volume and more people. If it does not, it ends there with no further obligation on your part.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

From first conversation to delivery with our Inventor drafter

The process starts with a conversation. We go through what is there, what needs to be finished, which standard applies and when it has to be ready. You then supply the details, usually together with existing drawings that need revising. We review those documents first and let you know if anything in them does not add up or cannot be traced.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

As soon as we have enough information, we start. We deliver in stages, because sending back a complete set in one go is awkward for both sides. With a partial delivery, your project lead sees early on how we apply the standard and can adjust course before the rest goes the same way.

Case study: Firefly

We incorporate the feedback and then move on to the next part. The rhythm of meetings differs per client. On one project we speak every two days, on another weekly, depending on the pressure on the schedule. Day-to-day contact runs via email and phone, and we visit you or you come to our office. Before a set leaves our office, it has passed through at least three review layers. A drafter draws, a second team member checks, Sam, our team leader, reviews it and Barry, our project manager, gives the final sign-off.

20+
projects
Hundreds
of drawings
Submit your dossier

When a deadline could not slip, we have previously worked evenings and weekends, with days of fourteen to fifteen hours, to deliver on time. Even while Sam was on a planned holiday, the work simply carried on. You can get in touch by phone or through the contact form on our site.

FAQ

Frequently asked questions about renting an Inventor drafter

Outsourcing pays off mainly with volume, repetition and a clearly defined brief. A revision pass across dozens of drawings or a series of variants of the same part goes faster with us than squeezed in between your own work. If the work is still very much in flux, you are better off keeping it in-house for a while. Coordination then costs more than the drafting. We also prefer to leave work that is intertwined with engineering with your own people, because we do not run calculations. We say so upfront, even if it means a job is not a good fit for us. That saves both sides a disappointment halfway through. In a first conversation, that line is usually clear within half an hour.

Both are possible, and we choose together what fits. A precisely defined job with a known number of drawings lends itself to a fixed price. Work that may still shift we prefer to bill by the hour, so you do not pay an uncertainty margin. We only bill actual working hours, so breaks do not appear on the timesheet. We do not offer prepaid hour bundles or a monthly hours subscription. Nor do you carry ongoing payroll costs, because we deploy what the project needs. Whichever arrangement it is, we agree it upfront so there is no discussion afterwards. Going through the documents together is the quickest route to a well-founded estimate.

Complete input keeps costs down the most. Usable source files, clear CAD standards and clear agreements save us detective work, and that is the most expensive part of drafting. Repetition helps too, because the more often a part recurs in the same form, the less time each subsequent version takes. A short, clear feedback round per partial delivery also helps, because we then are not drawing in two directions.

Unclear or partly hand-drawn documents actually cost extra, although we do sort them out ourselves. We flag it upfront if we see that the input is going to raise a lot of questions. You can then choose whether to put things in order yourself first. That keeps the timesheet predictable and explainable.

A small project is certainly possible, and we often even recommend it to new clients. With a small first assignment, you can judge our speed and accuracy on your own material. That says more than any story about ourselves. If it goes well, we scale up to more drafters and more volume. If it does not, it stops without anything continuing. We have no minimum purchase, no notice period and no subscription model. For a first job like that, a set of existing drawings and your CAD standards are usually enough to get started. A phone call or a message through the contact form is all it takes to get it going.

Our clients are engineering firms, architectural practices, contractors and manufacturers. More broadly, they are companies with technical drafting work that lack sufficient drafting capacity of their own. The people at the table are managers, team leaders and owners, so people who are responsible for staffing themselves. The reason is almost always capacity, and sometimes a vacancy that simply will not get filled.

Our clients are based in the Netherlands, and that is where our focus lies too. For Firefly, we have completed more than twenty projects and hundreds of drawings. We started this service last year because a client asked for it, and have offered it as a standard service ever since. If you want to know whether your type of work is a fit, feel free to put it to us.

We deliver in stages rather than a complete set in one go. That way, your project lead sees early on how we apply the standard and can adjust course. We incorporate feedback and then move on to the next part. Before anything leaves our office, it has passed through at least three review layers. A drafter draws, a second team member checks, Sam, our team leader, reviews it and Barry, our project manager, gives the final sign-off. We agree the meeting rhythm per project, from every two days to weekly. For standalone drafting jobs, files go back and forth by email. On larger projects, you can log in to software in which you follow the project.

Then we scale up and reshuffle internally to meet it. When it is urgent, we immediately add people from our own team, who are already in place. On previous deadlines like that, we have worked evenings and weekends, with days of fourteen to fifteen hours. Even while Sam was on a planned holiday, the work simply carried on. We do not promise delivery times in hours or days that we cannot guarantee. What we do is tell you honestly upfront what is achievable with which staffing. If things start getting tight along the way, we raise it immediately in our meetings. That way, your project lead stays in control of the schedule.

No, we work entirely in our own environment with our own licences. You do not need to arrange a workstation, a machine or access to your systems. We always work with the latest versions of the packages we use. Files are exchanged in DXF, DWG, Revit formats and STEP, and in any other common CAD format. What we do need is your CAD standards, because we draw to them consistently. For standalone work, files go back and forth by email. On larger projects, we use software that you can log in to and follow along. We decide together in the first conversation which route is most practical for this project.

Request a free consultation Question not listed? Call us

Let us handle your Inventor drafting

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Looking to rent an Inventor drafter? Reply within 1 to 2 working days. Book a call Call now