OutsourceCAD

Outsource Greenhouse Construction Drafting

Outsource greenhouse construction drafting to a team that repeats piping details at speed

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

We organise outsourced greenhouse construction drafting with our large, variable team, which scales per project with the volume and the schedule. Everyone who works on a greenhouse construction project with us has more than ten years of CAD experience, and Sam, our team leader, directs the technical side drawing on more than fifteen years of background in architecture.

We work fully remotely, in our own environment and with our own licences, while you simply keep your own CAD standards.

Barry, our project manager, is usually our first point of contact for a new request, after which Sam takes over the technical side, so you are left with one fixed point of contact for the whole project. In greenhouse construction, clients often work in AutoCAD, a package that does not handle repeating components such as valves in a piping system in a smart way. By outsourcing that work to us, you relieve your own drawing office during a peak and keep room for the work you want to do yourself.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

When it makes sense to outsource greenhouse construction drafting

Outsourcing greenhouse construction drafting makes the most sense as soon as your own team runs out of hours, for example during a peak in the drawing office or when a deadline can no longer move. If a drafter vacancy is temporarily open and nobody is filling it, you can often bring in our drafting team faster than you could hire and onboard a new employee. A set of Revit families or AutoCAD templates that has become clogged after years of use is also a reason to bring us in: cleaning up or rebuilding such a set takes time your own drafters would rather spend on current projects.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

If, on the other hand, your own team has enough capacity and the work is closely tied to ongoing engineering decisions, keeping it in-house is often more logical. We prove our value most clearly with repetitive, high-volume drafting, such as a series of pipe routes with different sizes each time, where our parametric approach saves a lot of time. For one-off, highly project-specific work that requires constant internal coordination on your side, that trade-off looks different.

Our large, variable drafting team scales per project, and when it is urgent we add people straight away, so a peak in greenhouse construction does not immediately lead to delays. That flexibility is exactly where outsourcing to us proves its worth: capacity that grows with the project, without you having to recruit or take on temporary staff for a peak that fades again after a few months. If you are unsure, give us a small part of the set first and only decide on the next step after that.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

The cost of outsourcing greenhouse construction drafting

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

We build up the cost side of outsourcing greenhouse construction drafting from the way we invoice and the hours that actually go into the project. We work on an hourly basis or at a fixed project price, and we decide which works best together with you. On an hourly basis we only bill pure working time: if a drafter steps away for five minutes for a coffee, that time does not go on the timesheet. We do not use prepaid hour bundles or monthly hour subscriptions; every project and every assignment stands on its own.

What keeps costs down in practice is mainly repetition: we build a parametric Revit family for a valve that comes in several sizes only once and then place it again each time instead of drawing it, which saves at least seventy percent of the time in that kind of work. A family library or template that we put in good order also reduces the cost of follow-on projects, because the foundation is then already in place. On top of that, you pay no ongoing salary costs: if a drafter is off sick or on holiday, we replace them internally so the project carries on without you paying extra for it. A short first assignment is possible with us, so you can judge our speed and accuracy before we agree on a larger project.

That way the cost structure stays transparent and directly linked to the work we actually deliver. Our tight check-in rhythm, where we steer early in the project rather than afterwards, also prevents unnecessary extra hours.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

Greenhouse construction clients and their challenge

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

The clients who outsource greenhouse construction drafting to us are usually engineering firms, contractors and manufacturers working with piping systems, technical installations and repeating components. The people at the table are often managers, team leaders or owners who can see that their own drawing office cannot handle a peak, or that a drafter structurally has too few hours left for the volume of drawings. A recurring problem in this sector is that AutoCAD, the package many greenhouse construction companies work in, does not handle building up components such as valves in a piping system in a smart way. If someone needs a valve in size ninety and another in size one hundred and ten, in practice they redraw it by hand every time. With a smart, parametric Revit family, we place such a component in the right size in a single action, with a material schedule that updates automatically.

That problem mainly affects companies that deliver many similar greenhouse structures and pipe routes one after another, where the same components keep recurring in slightly different sizes. Firefly is our client for this kind of work to date, with more than twenty projects and hundreds of drawings as a result. For this type of client we do not take over the design or the engineering, which explicitly stays with you, but we do take over the drafting and modelling around it, including cleaning up or rebuilding an outdated family library where needed. Our large, variable team also adapts to this and scales up as soon as a greenhouse construction project grows in volume. What you supply determines how quickly we can get started.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

How a greenhouse construction drafting project runs

Our process for outsourced greenhouse construction drafting always starts with a conversation in which you explain the situation and share the details of the project. Usually you also supply existing drawings that are due for revision, for example because someone modified an installation on site without updating the drawings. From that point our drafters get to work and we deliver in stages, so you do not have to review everything in one go at the end of the project.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

After each partial delivery we gather your feedback, process the changes and move on to the next part of the set. We agree the check-in rhythm with each client: with one we touch base briefly every two days, with another a weekly meeting is enough, depending on how fast the greenhouse construction project needs to move.

Case study: Firefly

On larger, long-running greenhouse construction projects we use software you log in to so you can follow our progress, while for standalone drafting we simply send files back and forth by email. Before we deliver a drawing, it goes through at least three review layers, from the drafter themselves to a second team member, Sam as team leader and finally Barry as project manager.

20+
projects
Hundreds
of drawings
Submit your dossier

We respond to a new request within 1 to 2 working days, after which we schedule the first conversation to set the start date. Once we have enough information, our drafters can start straight away, without you first having to wait weeks for a lengthy intake or extensive preparation on our side.

FAQ

Frequently asked questions about outsourcing greenhouse construction drafting

When you outsource greenhouse construction drafting, we take over the volume your own team can no longer handle, while the engineering stays with you. Doing it yourself means every peak has to be absorbed by your existing staff, which with a tight deadline quickly leads to working evenings and weekends. Instead, we add drafting capacity from our large, variable team, which scales per project. We work fully remotely, in our own environment and with our own licences.

We follow your CAD standards, not our own approach. If a drafter falls ill, we replace them internally so the project carries on. You pay no ongoing salary costs for this. A first, shorter assignment shows whether our approach is a good fit.

Where possible, we build repeating components such as valves as a parametric Revit family, a smart component that adapts to a new size. In AutoCAD, a drafter often redraws such a component by hand every time, for example a valve in size ninety and one hundred and ten. With a smart family we place the component in the right size in a single action. The material schedule updates automatically: if the component changes, the list changes with it without manual updating.

In that kind of work, this saves at least seventy percent of the time. If an existing family library is cluttered, we assess whether cleaning it up is quicker than building a new setup. We create such a setup once and then reuse it every time. In a first conversation we map out which components lend themselves to this.

We do not quote a fixed amount, because the costs depend heavily on the volume and complexity of the project. We work on an hourly basis or at a fixed project price, decided together with you. On an hourly basis we only bill pure working time, so a short break does not count. We do not use prepaid hour bundles or monthly hour subscriptions; every assignment stands on its own.

What mainly keeps costs down is repetition: a parametric family we build once saves drafting work every time it is used again. You also pay no ongoing salary costs, as you would with a permanent in-house drafter. A short first assignment is possible with us, so we can get to know each other before agreeing on a larger project. A conversation beforehand gives the best picture of what a specific project will require.

Our permanent team of drafters carries out the greenhouse construction drafting, each with more than ten years of CAD experience. Our large, variable team scales with the project, with as many drafters as the volume requires. Sam, our team leader, has more than fifteen years of background in architecture and previously worked in Iran for seven years. He directs the technical side of the drafting and still works as an engineer as well.

Barry, our project manager, is usually our first point of contact for a new request. Sam then takes over the technical side, so you keep one fixed point of contact. We have every drawing checked by at least three people before we deliver it. A conversation beforehand makes clear who we will put on the project.

Communication during an outsourced greenhouse construction project runs via email, phone and meetings, with Barry as your fixed point of contact for new questions. We set the rhythm per client, from a short check-in every two days to a weekly touchpoint, depending on the pace the project requires. On larger, longer-running projects we use software you log in to so you can follow our progress. For standalone drafting we send files back and forth by email.

Where it is more practical, we come to you or you visit our office. After each partial delivery we gather your feedback and process it before moving on to the next part. That way you stay connected without us needing daily contact. A first conversation determines which rhythm suits the project.

Yes, your own CAD standards remain leading with us throughout the project. We follow the layer structure, layer names and drawing conventions you provide at the start of the project. That prevents anyone from having to convert drawings afterwards before they fit into your own project folder. We usually also receive existing drawings at the first conversation to serve as a starting point.

If that existing set is no longer consistent, we straighten it out in consultation before we start on the new work. We deliver in stages, so any deviations from the standard stand out early in the project. File formats such as DXF, DWG, Revit formats and STEP match what you already use. A conversation beforehand records the standard once for the rest of the project.

We first review a cluttered Revit family file before choosing between cleaning it up or rebuilding it. If the existing set can still reasonably be organised, we clean it up and add new components. If the set has drifted too far from a workable structure, rebuilding is often quicker than fixing everything manually. A parametric family adapts to a new size or situation, so our drafters do not have to redraw a component every time.

The material schedule updates automatically with the drawing. For greenhouse construction companies, a tidy family library saves at least seventy percent of the time on that specific component. We carry out this work in our own environment, with the latest versions of the software. A first conversation maps out exactly how cluttered the existing set is.

Adjusting course during an ongoing project works well, because we deliver in stages as standard rather than in one go at the end. After each partial delivery we gather your feedback, process the comments and move on to the next part. We set the check-in rhythm per client, from every two days to weekly, so adjustments never have to wait for a fixed moment. If the scope changes halfway through, we discuss it at the next check-in.

On larger projects you can follow progress live through our software. Every drawing goes through at least three review layers before we deliver it in any case. When it is urgent, we also add extra drafters to meet an adjusted schedule. A short check-in is usually enough to put an adjustment in place.

Request a free consultation Question not listed? Call us

Hand your greenhouse drafting over to us

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Outsourcing greenhouse construction drafting? Reply within 1 to 2 working days. Book a call Call now