OutsourceCAD

Need a BIM Modeller

Need a BIM modeller for the repetitive volume in your drawing office

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

Firms that need a BIM modeller rarely get stuck on exceptional drawings, but on volume. In the assignments that come to us, the emphasis lies on repetition, with hundreds of sheets full of the same details, the same openings and the same components in a different size.

We count that up at the start, because the size of the repetitive part determines the entire schedule. We have now completed more than twenty projects and hundreds of drawings for Firefly, and that is exactly where the gains lay in building recurring components smartly.

Our team drafts and models, we do not do engineering and we do not give structural advice. We work in Revit, AutoCAD and Rhino, supplemented by Inventor, Grasshopper and to a limited extent Dynamo and Vault. The work is carried out remotely from our own office, and our focus is on the Netherlands. Our large, variable team scales with each project. You hear from us within 1 to 2 working days of an enquiry.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

What a BIM modeller costs and how we charge

Payment is by the hour or per project at a fixed price, and we choose the right form together. For a defined assignment, for example bringing a fixed set of sheets up to a current standard, a fixed project price is the obvious choice. If the scope is still moving and changes come in along the way, we work on an hourly basis, because a fixed price would then mostly contain a risk surcharge. We only charge pure working hours. If someone steps away for five minutes for a coffee, the clock stops, and that is not a slogan but simply how we record our hours.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

We do not offer a prepaid hours card or a monthly hours subscription, because that leads to hours nobody can use any more. With us, you bear no ongoing payroll costs, and in case of illness or holiday we arrange cover internally so there is no idle time. What keeps costs down most is the quality of the handover. A complete set with clear standards saves us searching, and searching is the most expensive form of drafting time.

Smart families also reduce the hours, because a component that adapts to a different size does not have to be created again every time. In piping work in greenhouse construction, that saves at least seventy percent of the time on the component concerned. We prepare an estimate based on the documents supplied and a sample of a few sheets. That sample tells us more than a long list of starting points. We present the outcome before we start, so your project leader knows where they stand.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

Scaling up when you need more modellers

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

Our team is already in place, so for us scaling up means deploying, not recruiting. An assignment often starts with one drafter who gets to grips with the standards and the existing set. If the volume increases, we expand on the same project with as many drafters from our large team as needed. When things are urgent, we add people straight away, without first going through rounds of interviews and onboarding. That is possible because everyone who works for us has more than ten years of CAD experience and the core of our team brings around twenty-five years of combined experience.

Scaling up does require discipline in conventions. Before more people start on a set, we fix the layers, naming, sheet layout and family structure. Without those conventions you would get ten variants of the same detail back, and that costs more afterwards than it delivers. Sam, our team leader, safeguards that consistency and divides the work into blocks that can run independently of each other. If someone drops out through illness or holiday, a colleague steps in and the work simply continues.

You notice nothing of this in the schedule and pay nothing for time not worked. Scaling down is just as easy, because as soon as the volume drops we take people off the project. We have no interest in staffing that is larger than the work. For a deadline that could not move, our team worked evenings and weekends, with days of fourteen to fifteen hours, to make the delivery. We agree that kind of effort in advance, not afterwards.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

From first conversation to partial delivery

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

The process starts with a conversation in which we go through the project, the planning and the drawing conventions. You then supply the details and usually an existing set that needs revising. We first go through those documents and report what is missing, so that no half-baked assumptions end up in the model. We then set up a trial sheet or a first component and present it to you. That takes little time and prevents us from drawing thirty sheets in the wrong direction. From that point we deliver in stages, collect feedback, make adjustments and carry on. The rhythm differs per client, because with one we meet every two days and with another weekly. That depends on how fast things need to move and how much changes per round. Day-to-day contact runs by email and phone.

For standalone AutoCAD drafting we simply send the files by email. On larger projects, such as greenhouse construction projects, we work with software that you log into to follow progress per component. We also come to you or welcome you at our office, although the work itself is carried out fully remotely. Before a part leaves our office, it has passed our review layers, with a second team member checking the work and Sam then going over it as team leader. Barry, our project manager, gives it a final look before we deliver. At the end we deliver the source files in the format you use, and ownership of them lies with you. We put any open points on a short list, so nothing is left hanging.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

Who needs a BIM modeller

Our clients are engineering firms, architectural practices, contractors and manufacturers, and more broadly companies with technical drafting work. At the table are managers, team leaders and owners, and they almost never come to us with a drafting problem but with a capacity problem. The usual reason is too little time, too few drafters or a peak their own team cannot handle.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

At an engineering firm, for example, there is a set that needs a complete revision while their own people are busy on a running design. At an architectural practice it is more often about model work and the drawings that have to come out of that model. Contractors ask us for as-built material, revisions and sheets that can be used on site.

Case study: Firefly

Manufacturers often have components that recur in dozens of variants and lend themselves perfectly to parametric modelling. We see that most clearly in greenhouse construction, where a 90 and a 110 valve are drawn by hand in AutoCAD every time. We build such a component once as a smart family, after which it is placed in a single action and the material schedule updates along with it.

20+
projects
Hundreds
of drawings
Submit your dossier

The clients we serve are in the Netherlands, our focus market. We started this last year at a client's request and have since added it to our range as a regular service. We do not yet have public reviews, so we would rather let a small piece of work speak for us. That is why we give a project leader who has doubts a limited first assignment to judge our speed and accuracy. What follows is something we decide together based on the result.

FAQ

Frequently asked questions when you need a BIM modeller

Usually because the peak is temporary and a permanent hire does not solve that. Recruiting takes months, and after that salary is tied to staffing that is too large once the project is over. We deploy people who are already in place, each with more than ten years of CAD experience. You only pay for the pure working hours we spend on your project. If someone drops out, we arrange cover internally and the schedule carries on. For work that recurs structurally, an in-house modeller can actually be the sensible choice. We simply say so when we see it that way. In a first conversation, that difference usually becomes clear quickly.

We base a quotation on the documents supplied and a sample of a few sheets. That sample shows how many actions an average sheet takes and how much of it repeats. We then choose with you between an hourly basis and a fixed project price. A fixed price suits a sharply defined set, an hourly basis suits work that is still moving. We only name figures once we have seen the work, because a shot in the dark helps nobody. What brings the quotation down is a complete handover with clear standards. Reusing components also noticeably reduces the number of hours. We go through the set-up in advance, so there is no discussion about hours afterwards.

Changes are part of this work, so we set up the project accordingly. We deliver in stages and collect feedback after each part. That way adjustments come in while the set can still be steered. With a large round of changes, we group the points by type rather than sheet by sheet. That saves actions and keeps the set consistent. If something changes in a parametric component, the material schedule updates automatically. If we work on an hourly basis, you simply see the extra hours on the timesheet. What falls within a fixed price and what falls outside it is agreed in advance in the project meeting.

No, much of our work is simply in AutoCAD. We draft 2D sets, piping diagrams, floor plans and detail sheets just as well in DWG as in a Revit model. Which route makes sense depends on the existing set and what you want to do with it. If there is already a fully detailed AutoCAD set, converting it to Revit often costs more than it delivers. If the same component recurs in dozens of sizes, that actually argues for working parametrically. We deliver in DWG, DXF, Revit formats and STEP, and in practice in any common CAD format. Our licences always run on the latest versions. We decide together in the first conversation which way to go.

That depends on the condition of the existing set. If the structure is reasonable and the names are consistent, cleaning up is usually the fastest route. If a set is full of duplicate families, loose parameters and manual exceptions, we would rather rebuild. In that case repairing takes more time than replacing, and the result remains fragile. We assess this per set and present our conclusion with a brief rationale. A newly built family adapts to a different size and carries the material schedule with it. As a result, the number of actions drops with every subsequent use. If you are unsure, let us look at a small part of the set first.

We put every piece of work through at least three review layers. A drafter produces the work, a second team member checks it, and then Sam, our team leader, reviews it. Barry, our project manager, goes over it as the final step before we deliver. As a result, the number of errors stays small in practice. With large sets we pay particular attention to consistency between sheets, because that is where most discrepancies arise. A wrong layer name on sheet twelve only stands out when it comes back on sheet ninety. By delivering in stages, we catch such points early. What you still want to check yourself is agreed at the start of the project.

We have experience with deliveries that could not slip by a single day. On such a project we immediately deploy more people and divide the work into blocks. In one such case, our team worked evenings and weekends, with days of fourteen to fifteen hours. Even during a planned holiday of Sam, that work kept going. We only commit to delivery times once we have seen the material. What we do guarantee is that the review layers stay in place even under time pressure. Working fast without checks only leads to a second round. If there is a hard date, mention it straight away in your enquiry.

We deliver the source files in the format you use. That is usually DWG or a Revit format, and where exchange with other software is involved also DXF or STEP. For standalone drafting we send the files by email. On larger projects you can log into the environment in which we track the project. We deliver in stages, so your drafting team can review early on. At the end comes the complete set, including the families and templates we have built. The intellectual property of all of it belongs to you. We make arrangements about the delivery structure and folder layout in the first conversation.

Request a free consultation Question not listed? Call us

Let us handle your BIM modelling volume

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Need a BIM modeller? Reply within 1 to 2 working days. Book a call Call now