Reply within 1 to 2 working daysNo subscriptionOur own software licences
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhinoDWG, DXF, RVT, STEP and every common CAD format
Yes, we offer a window frame schedules service, and that is the straight answer to the question most clients ask before reading any further. We provide it as part of our outsourced drafting for architectural practices, contractors and manufacturers who lack the in-house drafting capacity for this kind of detailed schedule.
A window frame schedule demands accuracy, because a wrong dimension or type feeds straight through to the order and the work on site. Our drafting team consists of people with more than ten years of CAD experience, led by Sam, our team leader, who has a background of more than fifteen years in architecture.
We work in Revit, AutoCAD or Rhino, using the latest versions of these packages, and deliver in the format you need. The work passes through at least three review layers before it leaves our office, which considerably reduces the risk of errors in a window frame schedule. That gives you a schedule you can put to use straight away.
Cable tray routing in the model, built with parametric families that carry the material schedule with them.
01
Who Uses a Window Frame Schedules Service
A window frame schedules service is mainly relevant to architectural practices, contractors and manufacturers, and more broadly to companies with technical drafting work in which window frames are a recurring element. The people at the table are usually managers, team leaders or owners who can see that their own drawing office can no longer keep up. At an architectural practice, the problem often lies in planning: an ongoing design has to move forward while a detailed window frame schedule is needed for the construction phase at the same time. For a contractor, the issue is more likely that an existing schedule no longer matches the current situation on site, for example after a change during construction that nobody has processed yet.
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.
Window frame manufacturers face something else again: a range with many variants in size and finish, each requiring a similar schedule. The trigger is almost always the same: too little time, too few drafters, or a peak the in-house team cannot handle without letting other work slide. For this kind of work, precision counts for more than speed alone, because an error in a window frame schedule only becomes visible on site, when it is already costly to fix.
Our drafting team is set up for this, with drafters who have more than ten years of CAD experience and are used to working to your standard and drawing conventions. Barry, our project manager, is usually the first point of contact for a new enquiry, after which Sam takes over the technical side. That way, whatever type of company you are, you know you have one fixed point of contact with us throughout the project.
Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Quality Control in Our Window Frame Schedules Service
Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.
The work passes through at least three review layers before we deliver a window frame schedule. A drafter draws up the schedule, after which a second team member checks the work for dimensions and completeness. Sam then reviews it again as team leader, and Barry carries out the final check before the schedule goes to you. With a window frame schedule this is particularly relevant, because it is an overview with many separate lines, each with its own size, type and quantity, in which a single slip can easily hide.
This sequence keeps the number of errors to a minimum in practice, even in an extensive schedule with many variants. An example from our own work shows why this works: an as-built file that had partly been drawn by hand and was hard to read, which we sorted out ourselves rather than repeatedly bothering the client, and still delivered neatly. We take the same approach to a window frame schedule based on existing, possibly outdated drawings. We follow your standard and drawing conventions, so the layout of the schedule matches what happens to it further down the process, for example when placing an order with a supplier.
Because we deliver in stages, you can check along the way whether the layout is right, instead of only discovering a discrepancy in the final result. That check applies to every line in the schedule, not just the special cases. That keeps the chance small that an error only comes to light on site.
Our own office with our own licences: nothing needs to be set up or released on your side.
No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.
We structure the cost of a window frame schedules service in two ways, by the hour or per project at a fixed price, and we decide together with you which form suits best. With hourly work, we only bill net working hours. If a drafter steps away for five minutes for a coffee, that time is deducted, so we never bill hours that were not spent directly on the window frame schedule. With a fixed project price, the amount is set in advance, regardless of small fluctuations during the work, which often works out better for a client with a tight budget. What keeps costs down above all is structure in what you supply. If you provide a clear set of existing drawings and a clear standard, less time goes into sorting out ambiguities.
Where there is a lot of repetition in frame types, we also build parametric Revit families, setting up a frame type once and then using it in other sizes without redrawing it. We do not work with prepaid hour bundles or a monthly hours subscription, and you pay no ongoing payroll costs. If a team member drops out due to illness or holidays, we replace that person, so the work continues without you paying extra for it. A short first assignment is possible, so you can assess our speed and accuracy before we agree on a larger project. We discuss which pricing structure suits best in the first conversation, based on the documents you supply and the layout you want for the schedule.
Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side
You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.
Bringing in a freelancer for a window frame schedule often means you depend on one person, with no backup in case of illness or other commitments. Taking on a new permanent employee takes time to recruit and train, while payroll costs keep running regardless of how much work there is at that moment. With us, the team is already in place, with drafters who have more than ten years of CAD experience, so we can start quickly as soon as you have supplied enough information.
Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.
During a peak, we immediately add extra capacity from our large, flexible team, something a single freelancer or a single new employee cannot offer.
Case study: Firefly
If someone drops out, we replace that person, so the project keeps running without you having to arrange anything extra. There is also always one fixed point of contact, Barry for the initial enquiry and then Sam for the technical side, whereas with a freelancer the point of contact and the backup are the same person. The intellectual property of the delivered window frame schedule belongs to you, as with other forms of collaboration. If you are undecided between these options, the best thing to look at is the size and repetitive nature of the work.
For a one-off, small job, solving it in-house or using a freelancer is sometimes enough, but with repetition and volume it is a different story. A small first assignment is a low-threshold way to experience the difference in practice. That gives you a picture of how working with us goes, without taking a big risk.
FAQ
Frequently asked questions about our window frame schedules service
Yes, window frame schedules are one of the standard parts of our outsourced drafting work. We draw up the schedule based on the details you supply and, where applicable, existing drawings that serve as a basis. We draft in Revit, AutoCAD or Rhino, depending on what fits the project. We deliver in the format you need, such as DXF, DWG or Revit formats. The work passes through at least three review layers, so errors in dimensions or quantities are eliminated as far as possible. We handle a one-off, small window frame schedule just as readily as an extensive one. We discuss exactly what is needed in the first conversation. That way you know in advance what we will deliver.
Architectural practices, contractors and manufacturers in particular have us draw up their window frame schedules. At architectural practices, an ongoing design often has to move forward while a detailed schedule is needed for the construction phase at the same time. Contractors more often deal with a schedule that no longer matches the current situation on site. Window frame manufacturers struggle with a range full of variants, each needing a similar schedule.
The people at the table are usually managers, team leaders or owners who are the first to feel the pressure on their own drawing office. The trigger is almost always capacity: too little time or too few drafters for the volume of work. Each of these clients gets the same fixed point of contact with us. A conversation about your specific situation quickly clarifies the approach.
The work passes through at least three review layers before it leaves our office. A drafter draws up the schedule, a second team member checks it for dimensions and completeness, and Sam, our team leader, then reviews it once more. Barry, our project manager, carries out the final check before the schedule goes to you. With a schedule containing many separate lines, this matters, because a single slip can easily hide among dozens of other lines.
We also follow your standard and drawing conventions, so the layout ties in logically with the next stage of the process. Because we deliver in stages, you can check along the way that everything is correct. That keeps the chance small that a discrepancy only shows up on site. In practice, that saves costly corrections afterwards.
We charge by the hour or per project at a fixed price, and we decide together with you which form suits best. With hourly work, we only bill net working hours, with no room for time not spent directly on the work. With a fixed project price, the amount is set in advance, regardless of minor changes during the work. What keeps costs down above all is clear input, such as a clear standard and well-organised existing drawings.
Where there is a lot of repetition in frame types, parametric working with Revit families reduces the time further. We do not work with prepaid hour bundles or a monthly hours subscription. You pay no ongoing payroll costs, not even during a quiet period. A concrete quote follows the first conversation, once the scope of the work is known.
A freelancer usually works alone, so there is no immediate replacement in case of illness or other commitments. With us, a permanent team stands behind the project, so someone else can step in if a person drops out. Everyone in our team has more than ten years of CAD experience, so there is no difference in quality with the replacement. There is also always one fixed point of contact, even when several people are working on the window frame schedule.
During a peak, we scale up immediately with our large, flexible team, something a single freelancer cannot offer. The intellectual property of the delivered work belongs to you in any case. A short first assignment shows the difference in practice. That way you can judge for yourself which approach suits you.
Yes, we handle a revision of an existing window frame schedule just as readily as drawing up a new one. You supply the existing documents, together with the changes you want or the reason the schedule is no longer correct. We then work out for ourselves how the existing schedule is structured rather than constantly calling you about it. If the existing set is messy or partly amended by hand, we straighten it out properly.
We then deliver in stages, so feedback comes in early. Our quality control, with at least three review layers, applies to revision work as well, not only to new work. Files usually go back and forth by email. A first conversation about the state of the existing material is the best first step.
That depends on the size of the project, because our large, flexible team scales with each project. For a small, one-off window frame schedule, one drafter is usually enough, supported by the standard review layers. For an extensive schedule with many variants, we deploy more capacity so the lead time remains manageable. We scale up with people from our existing, permanent team, not by hiring someone new.
Everyone involved has more than ten years of CAD experience, so no time is lost on induction. When a deadline cannot slip, we add extra capacity. Our quality control, with at least three review layers, remains in place with a larger team too. We give an estimate of the capacity required after the first conversation.
The project starts with a conversation in which you provide the details. You often also supply existing drawings that serve as a basis for the new schedule. From that, we can see how many frame types there are and how much repetition they involve. When an enquiry comes in, we respond within 1 to 2 working days. We start as soon as enough information is available to begin. We then deliver in stages, with feedback moments that match the agreed consultation rhythm. The intellectual property of the delivered schedule belongs to you. A short first assignment is a great way to assess our approach first.