How much does technical drafting cost, and what does outsourcing actually deliver?

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

How much does technical drafting cost when a drawing office can no longer handle the work on its own? Before we talk about hours, we define clearly what we do and what we do not do. We draft and model, in 2D and in 3D where needed, including as-built drawings and revision rounds on existing sets. We do not do engineering, we do not produce calculations and we do not advise on structures or permits.

That separation keeps the cost side clear, because you know exactly which part of the project sits with us. The work that suits us is often high in volume and repetitive: think of series of detail drawings, piping schematics, floor plans and changes that keep coming back.

Our clients are engineering firms, architectural practices, contractors and manufacturers in the Netherlands. We work entirely remotely from our own office, with our own licences and the latest software versions. We respond to a new enquiry within 1 to 2 working days, so the project leader quickly knows where they stand. This is followed by a conversation in which we go through the project and decide which form of billing suits it.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

Who outsources technical drafting

The question of what technical drafting costs usually comes to us from a company that would like to do the work itself, but does not have the people for it. Engineering firms run into a peak for which they do not want to hire a permanent drafter. Architectural practices have a set that needs to be worked up quickly while their own team is already fully booked. Contractors have as-built material lying around that nobody updates any more. Manufacturers want their product documentation in order, but the drawing office keeps putting it off.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

The people we talk to are managers, team leaders and owners, and their problem is almost never a lack of knowledge. It is capacity. There is too little time, there are too few drafters, or there is a peak that the in-house team cannot handle. We take on that part without you having to open a vacancy. Because we take over the drafting and not the engineering, control over the content stays where it belongs. The project leader keeps the decisions, and we deliver the drawings. That also makes the cost question easier to answer, because you are not buying an advisory programme but drafting capacity with a clear start and finish.

We notice that companies often call later than would be ideal, usually when the pressure is already high. Early contact gives us more room to divide the work properly. We can also start with a small first assignment, so you can judge our speed and accuracy before sending a larger volume our way. What ultimately determines the costs is mainly the size of the set and the amount of repetition in it.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

Scaling up without ongoing salary costs

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

The number of drafters we put on an assignment depends on what the project requires. For a small assignment one drafter is often enough, and for a large project we deploy as many drafters from our large, variable team as needed. The team is already in place, so when something is urgent we add people straight away without having to recruit first. For you, that means a different cost structure from hiring a permanent employee. No salaries keep running in a quiet month, there is no induction period of several weeks and no desk sits empty when the project comes to a halt.

If someone on our side is off due to illness or holiday, we replace that person and the work continues. A drawing office notices that difference most at peak times. A revision round on a large DWG set rarely comes in evenly, and that is exactly when it helps to have more hands available at short notice. Everyone who works for us has more than ten years of CAD experience, so we do not have to spend months supervising a junior before any output appears. Sam, our team leader, divides the work and keeps track of progress.

We do not use a prepaid block of hours or a monthly hours subscription, because that does not suit work that varies so much in scope from project to project. A short assignment is just as welcome as a project lasting months. You decide how much capacity you take, and we make sure that capacity is actually there at the agreed moment. If you already know several peaks are coming, you can mention that in the first conversation.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

How much does technical drafting cost in practice

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

What technical drafting costs depends first and foremost on how we bill. We charge by the hour or per project at a fixed price, and we decide which form fits in consultation with you. For a set with a clear scope and a fixed drawing type, a fixed project price is the obvious choice. For revision work whose scope only becomes clear along the way, an hourly basis is fairer for both sides. We only log pure working hours. If someone steps away for five minutes for a coffee, the clock stops, and meetings that are not about the drafting do not appear on the timesheet. As a result, you pay for output, not for presence. What further reduces costs is repetition. The more similar drawings an assignment contains, the faster our drafters work per drawing, because the CAD standards and layer structure are already fixed.

A complete dossier also saves time. If we have the right source drawings, dimensions and agreements straight away, we do not have to wait or reconstruct things ourselves. We would rather resolve ambiguities ourselves than call you every day, but a good starter package remains the fastest route. The choice of file format also plays a part, because a clean DWG needs less clean-up work than a drawing that was half made by hand. We do not give amounts on this page, because every set is different. In a first conversation we go through the material and indicate which form of billing is realistic.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

Working together during the drafting work

During the drafting work, you keep one fixed point of contact. Barry, our project manager, is the first to pick up new enquiries and remains available afterwards, while Sam takes over the technical side once the project is under way. Sam has more than fifteen years' background in architecture, worked in Iran for seven years, ran his own design firm in the Netherlands and still works as an engineer himself.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

He directs our drafters and safeguards the technical side. We match the meeting rhythm to the pace of the project. One client wants to catch up every two days, another is happy with a weekly check-in.

Case study: Firefly

We deliver in stages, gather feedback, process it and carry on, so you are never presented with months of work in one go. Day-to-day contact runs via email and phone, and on larger projects such as greenhouse construction projects we use software that you can log in to and follow progress. For standalone AutoCAD drafting we simply deliver by email. Clients are welcome to visit us and we also come to them, but the work itself is done remotely from our own office.

20+
projects
Hundreds
of drawings
Submit your dossier

We work in our own environment with our own licences, so your IT department does not need to set up accounts or workstations. The intellectual property of our drawings passes entirely to you. Clients have not asked for a non-disclosure agreement so far, but we are open to signing an NDA. If you want to know how many drafting hours a specific project needs, call us or use the contact form.

FAQ

Frequently asked questions about how much technical drafting costs

The costs depend on the size of the set, the amount of repetition and the state of the material supplied. A series of similar detail drawings takes less time per drawing than a run of unique drawings. The CAD standards also play a part, because a clear layer structure saves us searching. Messy source drawings, on the other hand, cost extra time, because we first have to interpret them. We only log pure working hours, so waiting time and breaks do not appear on the invoice. Depending on the project, we charge by the hour or at a fixed project price. We decide together in the first conversation which form fits best. Send us the material and we will respond within 1 to 2 working days.

Yes, we work both on an hourly basis and at a fixed price per project. A fixed price does require the scope of the work to be clear in advance. For a defined set of drawings with a known number of sheets and a fixed standard, that works perfectly well. For revision work whose scope grows along the way, an hourly basis is often cleaner. We discuss beforehand which form suits the project and put it in writing. If the assignment changes substantially along the way, we discuss that first. That way you are not faced with surprises afterwards. If you are unsure which form to choose, feel free to run the project past us.

No, we only log the hours we actually spend on the drafting work. If a drafter steps away for five minutes for a coffee, they stop the clock. We do not charge for waiting on missing information if nothing is happening on the drawing. Short project meetings directly related to the work are part of the assignment. We deliberately keep those meetings compact and schedule them at a fixed rhythm. We would also rather resolve ambiguities ourselves than keep calling you. That approach keeps the timesheet clear and the pace high. If you have questions about how our hours are built up, we are happy to give you insight into that.

We have a large, variable team and deploy as many drafters per project as the work requires. The team is already in place, so scaling up takes no recruitment time and no induction period of several weeks. When something is urgent, we add extra people to the ongoing assignment at short notice. Everyone who drafts for us has more than ten years of experience with CAD software. The core of our team has around twenty-five years of experience combined. Sam, our team leader, divides the work and keeps an eye on quality. How many people we deploy depends on the volume and the deadline. Let us know the lead time you need, and we will tell you what is feasible.

In case of illness or holiday, we replace the drafter so the work simply continues. With us, you pay no ongoing salary costs for someone who is not there. Because the whole team works to the same standard, a colleague can take over the file. Sam hands over outstanding points and checks the result again. In practice, the project leader mainly notices that the schedule holds. For a deadline that could not slip, our team worked through evenings and weekends. That is not standard, but it shows how we deal with a hard date. If you have a critical date, it is best to mention it right at the start.

Yes, we are happy to start with a small first assignment. You then judge our speed and accuracy on real work rather than on promises. A short assignment is just as welcome with us as a project lasting months. We do not require a minimum volume and do not work with a prepaid block of hours or a subscription. A good first assignment is a defined set with clear CAD standards attached. After that, you know what you can expect from us before the volume goes up. We also learn in such a first round how your drawing conventions are structured. A conversation about a suitable trial assignment can be arranged with a single phone call.

You keep one fixed point of contact with us throughout the entire project. Barry, our project manager, picks up the initial enquiry and stays involved in the agreements made. As soon as the drafting work is actually under way, Sam takes over the technical side. He directs the drafters and monitors progress and quality.

This means the project leader does not have to liaise with five different people at once about the same file. Contact runs via email, phone and scheduled meetings, depending on the pace of the project. On larger projects, you can log in to the project software and follow along yourself. If you would rather get acquainted first, you are welcome to suggest a meeting at our office.

We answer a new enquiry within 1 to 2 working days. We then schedule a conversation in which we go through the project and the approach. In that conversation we look at the documents, the scope and the required end date. As soon as we have enough information about the set and the standard, we can start. Usually you supply existing drawings that need revising. The more complete that package is, the sooner our drafters can get to work. We do not promise delivery times in hours, because that depends entirely on the set. Calling us or filling in the contact form is the quickest way to get started.

Request a free consultation Question not listed? Call us

Hand your technical drafting over to us

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Wondering what technical drafting costs? Reply within 1 to 2 working days. Book a call Call now