OutsourceCAD

As-Built Drawing

Outsource your as-built drawings when the volume ties up your own drawing office

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

An as-built drawing rarely comes on its own. In the assignments we receive, it is almost always a file of dozens to hundreds of sheets that all need updating to reflect the situation as built. That is the hallmark of this work: high volume, lots of repetition and relatively little thinking per sheet.

Updating a single floor plan takes a drafter an hour. Updating two hundred sheets takes a drawing office a quarter, and that quarter is usually not available.

We are set up precisely for that kind of volume. Our large, variable team scales with each project, and everyone who drafts on it has more than ten years of CAD experience. That is how we have completed more than twenty projects and hundreds of drawings for Firefly. We draft, we do not do engineering, and with as-built work that is a welcome boundary. It is about accurately recording what is there, not about rethinking how it should have been.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

From initial inventory to delivery in batches

An as-built drawing project opens with a conversation in which we establish what needs to be done and what is available. This is followed by an inventory of the material supplied. We look at how many sheets there are, which of them are complete, where the gaps are and which files open without problems. We deliberately take that step before any drafting starts, because a file that turns out to be incomplete halfway through costs more than a day of inventory at the outset. We then split the work into batches.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

A batch is a logically connected part, for example a building section, a floor or a series of sheets with the same kind of change. The first batch goes through the full route of drafting, checking and delivery as a trial. You review it and give feedback, and we apply that feedback not only to that batch but to the working agreements for every batch that follows. That way, a misunderstood convention stays limited to a handful of sheets instead of the whole file. After that, the project continues in a steady rhythm.

We deliver per batch, you spot-check the work and we keep track of which points have been referred back. The way we keep in touch differs per client. Some project leaders want a brief catch-up every two days, others are happy with a weekly check-in. Contact runs via email, phone and meetings, and on larger projects via software that you can log into to follow the project. We come to you or you come to us, but the work itself remains remote.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

What we learned from a messy as-built file

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

The clearest example from our as-built and revision work came from Firefly. We were supplied with material in which the existing drawings had been printed incorrectly and were partly drawn by hand. Legibility was poor, the structure was messy and on some sheets it was hard to see what the original intention had been. The reflex with a file like that is to refer every unclear point straight back to the client. We took a different approach.

Instead of calling again and again, we worked it out ourselves, by comparing sheets with one another, recognising recurring patterns and reconstructing hand-drawn parts from what did add up elsewhere. The result was still delivered cleanly. We took two lessons from that. The first is that the quality of source material almost never reaches the level assumed beforehand, and that it is wise to treat the first sheets as a reconnaissance. The second is that bundling questions works better than passing them on one by one.

A project leader who is interrupted ten times a day loses more time than they save. So we collect whatever remains genuinely unclear and put it to you in one go, together with our own reading of it. The same goes for a deadline that cannot slip. For a deadline like that, our team worked through evenings and weekends, with days of fourteen to fifteen hours, and the work carried on even during a planned holiday of Sam, our team leader. That is not our regular rhythm, but it shows how we treat a firm commitment.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

An as-built drawing that follows your layer structure

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

An as-built drawing only has value if it fits into the system you continue working in. That is why we work to your firm's standard and drawing conventions, not our own. At the start, we ask for the template, the layer structure, the linetypes, the hatches, the title blocks and the naming of files and sheets. The way changes are marked and how the status is tracked are part of that too. If there is no documented standard, we derive it from the existing set and put our assumption to you for confirmation. With as-built files, that is no formality. Anyone taking over an existing set often finds several conventions side by side, because different people have worked on it over the years. The question then is which line we follow.

We do not make that choice ourselves; we put it to you. In the layer structure, we also watch out for things that come back to bite you later: objects on the wrong layer, manually overridden properties, blocks that only exist in one file and external references with paths that are no longer correct. We flag points like these before we continue, because otherwise they spread across the whole set. What we deliver are the source files in the format your firm works in, so that your own team can carry on with them without an intermediate step. You retain the intellectual property of every drawing we make. We do not hold back any files and do not deliver the set as a locked export.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

Three review layers on every as-built drawing

Every as-built drawing we produce goes through at least three review layers before it leaves the building. A drafter creates the sheet. A second team member then checks that work, with fresh eyes and without the assumptions of the person who drew it. Sam, as team leader, then checks the technical side and the coherence between the sheets. Barry, our project manager, gives it a final look before the set goes to you.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

That may seem a lot for work that looks simple at first glance, but with volume it really pays off. An error in a single sheet is a correction. The same error in a convention applied across a hundred sheets is a week of repair work.

Case study: Firefly

In practice, the review mainly catches three things. First, dimensions taken from unclear source material. Second, deviations from the agreed set-up, such as a sheet set up on the wrong layer or a title block that has not been filled in completely. Third, inconsistency between sheets made by different drafters, because that risk arises as soon as several people work on one set at the same time.

20+
projects
Hundreds
of drawings
Submit your dossier

Because the work follows this route, the number of errors in practice stays minimal. That does not mean you no longer need to check anything. It means you can do it with spot checks rather than sheet by sheet, and in a large file that saves more time than the drafting itself. We keep a record of what has been checked per batch and which points have been referred back, so that there are no loose ends at delivery.

FAQ

Frequently asked questions about as-built drawings

By that we mean the complete set of drawings that records the situation as built. In practice, it is often the final status of a series of changes, gathered into one coherent package. It covers floor plans, sections, elevations, details and diagrams, supplemented with overview sheets. For MEP work, piping diagrams and opening drawings are part of it too.

We update a file like that on the basis of what you supply, from marked-up prints to survey data and photos. Delivery consists of the source files in the format your firm continues working in. What is not included are calculations or technical justifications, because that falls outside our work. We decide together at the start which elements belong in a specific file.

That depends mainly on the lead time you want, not on a fixed limit. With our large, flexible team, we scale up or down per project, and in this work more hands means more sheets per week straight away. The team is already in place, so scaling up takes no recruitment time. If it is urgent, we add people immediately. What usually limits the speed is not staffing but the quality of the source material. A file with clean drawings moves considerably faster than one in which half has to be reconstructed. That is why we divide the work into batches and track how the pace develops per batch. After the first batch, we can give you a realistic schedule for the rest.

Then we first work out what can be extracted from it. In this work, an incomplete file is the rule rather than the exception, so we allow for it. We compare sheets with one another, look for recurring patterns and derive missing information from parts that do add up. Whatever then remains genuinely open, we bundle and put to you in one go, together with our own reading of it.

That keeps the number of interruptions for your project leader to a minimum. We never quietly carry assumptions through, because in a large set a wrong assumption multiplies at lightning speed. Already at the inventory stage, we flag which parts carry a risk. If you are unsure about the state of your file, you can let us take a look at it first.

No, we do not carry out on-site surveys. Our work is done entirely remotely from our own office, and we process the data you supply. That can be survey data, marked-up prints, photos of the construction, sketches or reports. As long as the information can be traced back, we can work with it. We are not an engineering firm either, so we do not assess whether the measured situation is technically correct. What we do is record that situation accurately in the drawings, to the agreed standard. You are of course welcome to meet in person, at your office or at ours. The work itself remains remote, because that benefits the speed.

Because one final check comes too late for work done in volume. Our route runs from the drafter to a second team member, then to Sam as team leader and finally to Barry as project manager. Each layer looks at something different, so there is little chance of an error slipping through all of them. A second team member mainly spots what the drafter overlooked. Sam looks at the technical coherence between the sheets. The final check focuses on whether the whole meets what was agreed. With hundreds of drawings, that is the difference between a single correction and a week of repair work. As a result, the number of errors in practice is minimal.

Yes, that happens regularly and we treat it as reconstruction work. We have previously processed material that had been printed incorrectly and was partly drawn by hand, hard to read and messy in structure. We convert sheets like these into a digital set to your standard. Where the hand-drawn information is unclear, we take cues from sheets that do add up. Where that is not possible, we flag the point instead of putting down something plausible. The pace of this work is lower than with a clean set, and we tell you that up front. What it gives you is a file your own team can move forward with again. A sample of a few sheets quickly shows what is possible.

Then we organise the work around that date. For a deadline that could not slip, our team has previously worked through evenings and weekends, with days of fourteen to fifteen hours. The work also carried on at the time during a planned holiday of Sam, the team leader. That is not our regular rhythm and we do not present it as standard. It does show how we deal with a hard deadline. More practically, when it is urgent we put extra people on the file straight away and arrange the batches so that the critical part is finished first. We do not quote a lead time in days, because it depends on the scope and the source material. We discuss what is achievable as soon as we have seen the set.

By agreeing the conventions in advance and using the first batch as a benchmark. Before several drafters work on a set at the same time, we decide how recurring situations will be drawn. That first batch goes through the full review and is presented to you. Only once you have approved it does the rest of the team start working with it. Sam, as team leader, then monitors the coherence between the sheets and steps in as soon as two different approaches emerge. With volume work, inconsistency between drafters is a bigger risk than a single drafting error. The second review layer pays explicit attention to it. If you want to see how that works out, you can start with a small first batch.

Request a free consultation Question not listed? Call us

Hand your as-built drawings over to us

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Need your as-built drawings updated? Reply within 1 to 2 working days. Book a call Call now