OutsourceCAD

Meet Your Drafting Deadline

Meet your drafting deadline with a team that gets straight to work

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

If meeting your drafting deadline is at the top of your schedule, you soon start looking at the software the work is done in. We draft in Revit, AutoCAD and Rhino, and also use Inventor and Grasshopper. We use Dynamo and Vault to a limited extent, where the process benefits from them.

We always run the latest versions, in our own environment with our own licences. We deliver in DXF, DWG, Revit formats and STEP, and otherwise in any common CAD format.

That choice is not a detail when a date is fixed. A set that comes back in the wrong format costs you a day you do not have. That is why, before the first drawing, we agree which package, which version and which format are leading. We then divide the work across the team and deliver in stages. That way your project lead can see well before the date whether the pace is right. When it is urgent, we scale up immediately with extra drafters.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

From first conversation to partial delivery on a tight deadline

The process starts with a conversation in which we go through the project and the deadline. We want to know which drawings exist, what is still to come and where the pressure lies. You then supply the documents, usually existing drawings that need revising. We go through that set and point out what is missing before the drafting begins. Next, we divide the work into blocks that can run independently of each other. We deliver those blocks in stages rather than everything at the end. On each part we gather feedback, make adjustments and move on to the next block.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

That order is a deliberate choice, because an error in block one would otherwise end up in every block. The meeting rhythm depends on how urgent it is. With a tight deadline we speak every two days, on a calmer project weekly. Contact runs via email, phone and meetings, and we visit you or welcome you at our office. For standalone AutoCAD drafting, files go back and forth by email. On larger projects, such as greenhouse construction projects, we work with software you log into to follow progress.

That way nobody has to guess how many sheets are finished. If the volume increases, we add drafters from our large, flexible team. Barry, our project manager, is the first point of contact for the enquiry, after which Sam, our team leader, takes over the technical side. That set-up keeps the lines short and prevents questions from being left unanswered just as the deadline approaches. We respond to a new enquiry within 1 to 2 working days.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

An as-built file where the deadline could not move

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

Our work for Firefly now spans more than twenty projects and hundreds of drawings. One of those files came in as as-built material that was barely legible. The existing drawings had been printed incorrectly and parts had been drawn by hand. Dimensions were skewed on the sheet and the structure was messy. We could have called the client about it constantly. We did not, because every question causes a day's delay. Instead, we worked it out ourselves and still delivered the set neatly.

What we take from that is simple: unclear source material is no reason to wait. We solve what we can solve ourselves and only put the real decisions to you. On another project, there was a date that could not move. The team worked evenings and weekends, with days of fourteen to fifteen hours. That work even carried on during a planned holiday of Sam, the team leader. We do not call that standard practice, but it shows what we do when a deadline is fixed. Revision work on existing DWGs is the most common type of work in this context.

We strip out old layers, correct dimensions and bring the set back to a workable structure. After that, updating changes goes considerably faster. Part of that file consisted of details that came back in dozens of variants. We built those as smart components, so a change does not mean twenty rounds of manual work. For the client, it meant the final round of corrections was a matter of pushing through rather than redrawing.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

Drafting work to your own standard

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

We work according to your standard and drawing conventions. You give them to us, and we adopt them as they apply within the project. That covers layer structure, line weights, hatching, scales, title blocks and sheet naming. If templates and families are available, we continue drafting in them. If some of those conventions are missing, we derive them from the existing set and put our proposal to you. That costs half an hour of discussion at the start and saves an entire round of corrections later. With a tight deadline, that is the difference between making it and just missing it. We regularly see sets in which the layer structure has silted up over the years. Old revision layers, duplicate blocks and manual lines of text are then all mixed up.

We clean that up at the pace at which we are going through the drawings anyway. What we do not do is impose our own house style. The set has to fit what you already use internally, even if we would set it up differently ourselves. We do, however, work in our own environment with our own licences. Exchange therefore runs via file formats, not via an account on your systems. In DWG, DXF, Revit formats and STEP, the work comes back in the form the next stage of the process requires. We agree that form in advance, so nothing needs to shift at the end. If something in the standard changes halfway through, we incorporate it in the ongoing blocks. We tell you straight away if a change affects the pace.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

Three review layers that keep the drafting right and on time

At OutsourceCAD, work passes through at least three review layers. A drafter draws it, a second team member checks that work and Sam then reviews it as team leader. Barry, as project manager, gives it a final check before the set goes to you. As a result, errors stay minimal in practice. With a fixed date, that matters more than it might seem.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

An error that only surfaces during your final check costs an extra round. That round falls in exactly the week when there is no slack left. Our checks mainly catch the things that repeat. A wrong layer in a detail that comes back fifty times, a title block with an old revision code, a dimension that was not updated with a change.

Case study: Firefly

The second reader looks at the drawing with different eyes from the person who made it. Sam also pays attention to the technical consistency between sheets. He has more than fifteen years of background in architecture and still works as an engineer. Every drafter we deploy has well over ten years of CAD experience. Combined, the core of our team has around twenty-five years of experience.

20+
projects
Hundreds
of drawings
Submit your dossier

Because we deliver in stages, the results of those checks also reach you along the way. That leaves time to adjust something before the deadline comes into view. We record for every sheet who checked what, so any question afterwards can be traced quickly. That record-keeping costs little and prevents searching in the busiest phase.

FAQ

Frequently asked questions about meeting your drafting deadline

We then add extra drafters to the ongoing block, usually within the same week. The team is ready and waiting, so scaling up takes no recruitment time. Our large, flexible team scales with each project, so there is always room to grow. We redistribute the blocks so that separate parts run side by side rather than one after the other. What does not change is the checking, because it stays in place at every layer. We tell you immediately if a shift in scope affects the pace. On an earlier project our team worked evenings and weekends to meet a fixed date. A phone call is enough to align the crew with the new schedule.

We deliver in DXF, DWG, Revit formats and STEP files, depending on what the next stage of the process requires. In practice we can work with any common CAD format. Our main packages are Revit, AutoCAD and Rhino, and that is where most of the volume lies. We also use Inventor and Grasshopper, plus Dynamo and Vault to a limited extent. We always run the latest versions and work with our own licences. Before the first drawing, we agree which version and format are leading. That prevents a set coming back in a format you cannot work with. Let us know in your enquiry which package you use internally, and we will match it.

We split the work into blocks and deliver them one after another. After each block we gather feedback and process the comments. The next block then continues along the same lines, with the corrections already incorporated. That way a deviation stays limited to a small part of the set instead of affecting every sheet. You also see early on whether the pace matches the deadline. On a tight schedule we speak every two days. On larger projects you can log into the software and follow progress. In the first conversation we tailor that breakdown to the size and deadline of the project.

It has happened and it can happen again, although we do not make it a regular pattern. For a deadline that could not move, the team worked evenings and weekends. There were days of fourteen to fifteen hours in a row. The project simply carried on even during a planned holiday of Sam, our team leader. We only bill productive working hours in those cases too, so only the time actually spent on the drawings. More often we handle busy periods by deploying more people rather than working longer days. That is also the better route for the quality of the drawings. When an enquiry comes with a fixed date, we discuss in advance which approach fits.

The checking stays fully in place even at a high pace, because that is exactly where the risk lies. At least three layers look at every drawing before it goes out. The drafter delivers, a second team member checks and Sam then reviews it as team leader. Barry, our project manager, gives it a final check before the file goes to you. So we do not speed up by skipping steps, but by putting more people to work in parallel. The checks mainly catch repeated errors, such as a wrong layer in a detail that comes back often. As a result the number of errors stays minimal in practice, even in weeks with a lot of sheets. We are happy to explain this approach in a first conversation.

In that case we work out for ourselves whatever can reasonably be worked out. We did that before with an as-built file with poorly legible prints. Parts had been drawn by hand and the structure of the sheets was wrong. We did not call the client about every unclear point, because that would have brought the project to a standstill. We only put real decisions to you, bundled together rather than one at a time. We record any assumptions we make, so you can check them at the partial delivery. If something is missing that we cannot possibly deduce, we ask for it straight away. A short inventory beforehand prevents most of these situations at the start.

For each job we deploy as many drafters from our large, flexible team as the work requires. We decide how many people are involved based on the volume, the drawing types and the deadline. The team is already in place, so we can arrange that crew quickly without a recruitment process. When it is urgent we add someone to the ongoing work immediately. Deploying more drafters only works if the work can be split into blocks properly. A set with many similar sheets lends itself perfectly to this. A small but tightly interwoven model we prefer to keep with two people and short lines of communication. When you enquire, we tell you which crew size is realistic for the work.

Yes, the delivered set must be directly usable in your next stage. That is why we agree in advance which sheets, scales and naming you will get back. For work preparation, that often means a complete set with details and material schedules. For construction, what matters most is whether the dimensions and revision codes on every sheet are correct. We deliver in the format that next stage requires, from DWG to Revit. Where we use parametric families, the material schedule updates automatically with a change. That saves you manual work at the point when the drawings have already come in. Get in touch to discuss the form in which the set needs to fit.

Request a free consultation Question not listed? Call us

Let us help you hit your drafting deadline

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Need to meet a drafting deadline? Reply within 1 to 2 working days. Book a call Call now