OutsourceCAD

Have Revit Drafting Done

Have Revit drafting done with pure working hours and a fixed review process

Request a free consultation See what we deliver
Reply within 1 to 2 working days No subscription Our own software licences
Parametric Revit family of a cable tray with a linked material schedule
25 years
of CAD experience at the core of the team
3 layers
of review before every delivery
Large
flexible team that scales with every project
RevitAutoCADInventorRhino DWG, DXF, RVT, STEP and every common CAD format

For many clients, having Revit drafting done starts with the question of how we build up our costs and why that works differently from an employee of your own. We charge by the hour or at a fixed project price, and we decide that together with you, depending on how predictable the work is.

We only bill pure working hours. If a drafter steps away for five minutes for a coffee, we deduct that time from the hours we charge. That sets us apart from prepaid hour bundles or a monthly hours subscription, which we do not work with.

Our team works in the latest version of Revit, and everyone who works for us has more than ten years of CAD experience, led by Sam, our team leader, who has more than fifteen years of background in architecture. Every piece of work goes through at least three review layers with us before it goes to you. Our large, variable team scales with each project, so a peak in your drawing office does not cause delays. Our focus is on the Netherlands and we do the work remotely, from our office.

Submit your work Or call +31 (0) 651924055

Cable tray routing in the model, built with parametric families that carry the material schedule with them.

01

Clients who have Revit drafting done

Having Revit drafting done is a question that mainly comes up at engineering firms, architecture practices, contractors and manufacturers, in short at companies with technical drafting where Revit has a fixed place in the process. The people we talk to are usually managers, team leaders or owners who can see that their own drawing office can no longer keep up with demand. The trigger is almost always capacity: too little time, too few drafters, or a peak the in-house team cannot handle without other projects being delayed.

Revit family with a linked material schedule, built to the client's CAD standard
A smart component with a live material schedule: a change to one part is reflected in the schedule straight away.

At an architecture practice, it is often a set of Revit models that has to be updated alongside ongoing projects. At a contractor, it is more likely to be a revision round on existing drawings that has to be put in order before construction starts. At a manufacturer, the scale is often different, with a lot of repetition in components and variants that we build up one by one in Revit. In all those cases, what is missing is rarely knowledge, but hours on the floor at the moment they are needed.

We then deploy our team as an extension of the existing drawing office, not as a replacement for it. You keep control of your project, while we absorb the extra volume at that moment. For companies without in-house Revit experience, our service is just as useful, because we adopt their standard rather than imposing our own approach. That makes the switch easy for you, even if you have never outsourced drafting before.

Model in Revit
Built from the documents you supply, consistently to your standard.
Drawings from the model
Floor plans, sections, elevations, details and overviews.
As-built and revisions
Updating existing sets and dossiers that have fallen behind.
Parametric families
Smart components with a material schedule that updates with them.
3D modelling
In Rhino or Inventor, converted to the format your supply chain uses.
Template clean-up
Cleaning up or rebuilding existing families and templates.
Send us your set or model and we will tell you what we can deliver from it.
Book a call
02

Quality control when you have Revit drafting done

Architecture firms
Three projects under way, and the modelling for the fourth is stalling.
Manufacturers
The product line needs to become smart components, but nobody in-house can be freed up.
Contractors
The as-built dossier needs updating while the drawing office has already moved on to the next job.
Engineering firms
A peak in drafting work that your own team cannot absorb.

Quality control is one of the first questions clients ask when they have Revit drafting done by an external team. With us, every piece of work goes through at least three review layers before it goes out. A drafter builds the model, a second team member checks that work for errors and for consistency with the rest of the project, Sam, as team leader, then reviews it from his technical background, and Barry, our project manager, looks over it last before we send it to you. We do not use that structure for show.

In a model with a lot of repetition, such as a series of similar components or a set of Revit families used across several projects, a single glance will not catch the small deviations that multiply later on. By running several checks in succession, we keep the number of errors minimal in practice, even at high volume or on a tight schedule. When revising existing drawings, we use the same structure, so we do not simply carry errors from the original over into the new model. Sam has more than fifteen years of background in architecture and directs the technical side of the team, while Barry, as first point of contact, keeps an overview of what is happening in ongoing projects.

For you, that means less of your own checking time and more certainty that a delivered model is actually correct before you use it further in your process. That is exactly why we apply this structure to every project.

OutsourceCAD drafters at work in our own drawing office
Our own office with our own licences: nothing needs to be set up or released on your side.

No ongoing payroll costs and no idle staff once the peak is over. If one of our people is off sick or on holiday, we replace them and the work simply carries on.

Request capacity See how a project runs
03

The cost side of having Revit drafting done

01
Introduction and handover
We go through the work and receive the details and drawing conventions.
02
Reply within 1 to 2 working days
With enough information we can start straight away.
03
Delivery in stages
A first part comes back to you, you review it and we collect your feedback.
04
Check-ins at your pace
Every two days when it is urgent, weekly when things are calmer.

The cost side of having Revit drafting done works differently with us than with a permanent employee. We charge by the hour or at a fixed project price for the whole project, and we decide together with you which arrangement fits best. For a project that is easy to scope, such as a clearly defined set of drawings, a fixed price is often the obvious choice, because you then know in advance where you stand. For work whose scope is not yet fixed, such as an ongoing revision round on an existing file, an hourly basis often fits better, because our input then moves with what the project actually requires. What brings costs down in both cases is mainly how efficiently we set up the repetitive part of the work. A well-built set of parametric Revit families saves considerable time compared with redrawing by hand each time, and that time saving feeds directly into the hours we need.

We also only bill pure working hours. If a drafter steps away briefly, that time does not count. We do not work with prepaid hour bundles or a monthly hours subscription, so you do not pay for hours without work. You also bear no ongoing salary costs as you would with an employee of your own, because we replace someone who is ill or on holiday, so the work carries on without you paying extra for it. We prepare an estimate in the first conversation, based on the documents supplied and the CAD standard you require.

Your fixed points of contact
Project manager Barry leads the first conversation, team leader Sam keeps a firm grip on the technical side

You never have to explain the situation all over again. Getting acquainted takes a short fifteen-minute call.

Barry (project manager) and Sam (team leader) of OutsourceCAD
04

Freelancer, permanent employee or having Revit drafting done

Having Revit drafting done by our team differs clearly on a number of points from hiring an individual freelancer or taking on a new permanent employee. A freelancer usually works alone, without the second and third check we build into every project as standard. With us, every piece of work passes a drafter, a second team member, Sam as team leader and Barry as project manager before it reaches you.

Step 1
Drafter
Creates the model and the drawings.
Step 2
Second team member
Checks the work for structure and dimensions.
Step 3
Sam
Team leader: reviews the technical side of the set.
Final check
Barry
Project manager: gives it a final review before delivery.

If a freelancer drops out due to illness or being busy elsewhere, the work stops, whereas we replace someone who drops out so the project carries on. A new permanent employee brings other obligations, such as ongoing salary costs, even in periods with less work.

Case study: Firefly

With us, you only pay the pure working hours we actually spend on your project, with no salary costs that continue during holidays or a quiet period. Our large, variable team also scales with the volume of each project, something that is not possible with a single permanent employee. The intellectual property of what we deliver belongs to you, just as with your own staff, so nothing changes there.

20+
projects
Hundreds
of drawings
Submit your dossier

If you are weighing up these options, the key difference lies in the combination of several experienced drafters, a fixed review structure and the ability to scale up and down quickly without the obligations of an employment contract. A small first assignment shows how that combination works out in practice with us.

FAQ

Frequently asked questions about having Revit drafting done

We do not quote a specific amount, because the costs depend on the size and complexity of the project. We charge by the hour or at a fixed project price, and we decide together with you which arrangement fits best. For an assignment that is easy to define, a fixed price is the obvious choice; for work whose scope may still change, an hourly basis often fits better. We only bill pure working hours, meaning only the time we actually spend on the project.

The more efficiently we set up the repetitive part of the work, the fewer hours we need. A well-built set of Revit families quickly makes the difference there. In a first conversation, we prepare an estimate based on the documents supplied. That way you know where you stand.

We work both by the hour and at a fixed project price, and we decide together with you which arrangement fits best. For a clearly defined set of drawings, clients often choose a fixed price, because the costs are then clear. For work whose scope may still shift, such as an ongoing revision round, an hourly basis often fits better, because our input moves with what the project requires. We only bill pure working hours, and we do not work with prepaid hour bundles or a monthly hours subscription.

If a drafter steps away for a coffee, that time is not counted. We discuss which arrangement fits in the first conversation, together with the schedule. That way there is no ambiguity about the agreement we use. A combination of both arrangements within one project is possible.

What mainly brings costs down is how efficiently we set up the repetitive part of the Revit drafting. A well-built set of parametric Revit families saves time compared with components a drafter redraws by hand every time. With a messy family set, we sometimes rebuild it faster than we could repair it. A clear CAD standard also helps, because our team then does not have to switch between ways of working.

We only bill pure working hours, so we never charge for time we did not spend. Because our team scales with the work, you do not carry any overcapacity. A well-prepared file also saves time compared with a file we first have to sort out. A first conversation quickly shows where we can save the most time.

With a freelancer, one person does the work, without the second and third check we carry out as standard. With us, every piece of work passes a drafter, a second team member, Sam as our team leader and Barry as our project manager before it reaches you. If a freelancer falls ill, the work stalls, whereas we replace someone who drops out so the project carries on. Our large, variable team scales with the volume of each project.

Everyone on our team has more than ten years of CAD experience, led by Sam, who has a background in architecture. The intellectual property of the result belongs to you regardless. For smaller, one-off jobs, a freelancer can sometimes move faster. For larger or ongoing volumes, our team with several review layers gives more certainty.

If a drafter is out due to illness or holiday, we replace that person so the project carries on without delay. Our team does not consist of one person per project, but of several people who work to the same CAD standard. If Sam is temporarily unavailable, we safeguard technical guidance through the team, and Barry keeps an overview of ongoing projects. When things are urgent, we add extra people straight away, so we still meet a deadline that cannot slip.

You notice little of any change, because we record the CAD standard and project agreements. This way of working stops you from depending on the availability of a single individual. A fixed point of contact on our side remains reachable even when others are out. That is how we keep the project's progress on track.

Every Revit model goes through at least three review layers with us before it goes to you. A drafter builds the model, and a second team member checks that work for errors and consistency. Then Sam, as team leader, reviews it, and Barry, as project manager, looks over it last before it goes out. In a model with a lot of repetition, such as a set that comes back often, that extra pair of eyes is valuable, because a small error multiplies quickly.

This structure keeps the number of errors minimal, even at high volume or on a tight schedule. When revising existing work we apply the same checks, so we do not carry over errors from the original. We apply that process to every project, whatever its size. You can therefore count on our model being correct.

Our large, variable team grows during an ongoing project when the volume turns out to be larger than expected. That team is already in place and we deploy it per project, so scaling up does not mean we first have to recruit new people. When things are urgent, we add extra people straight away, so a growing project does not get stuck because of a shortage. Everyone who works for us has more than ten years of CAD experience, so newly assigned people can work to the standard straight away.

Sam and Barry keep track of progress, including during that growth. You do not have to estimate perfectly in advance how big your project will become. A catch-up along the way makes clear whether we deploy extra capacity. That keeps the schedule achievable, even when the scope changes.

For an estimate, we need a clear idea of what has to be drawn, from a single component to a complete Revit model, and whether it is new work or a revision. We prefer to receive existing drawings that need revising early on, so we can properly estimate the scope of that work. The CAD standard and file formats you use also factor into our estimate. It is also useful to know how tight the turnaround time is, because that determines the capacity needed.

A first conversation maps out these points. We reply to a new request within 1 to 2 working days. As soon as we have enough information, we quickly start on the first work. A smaller assignment as a first step is also possible, to assess the collaboration.

Request a free consultation Question not listed? Call us

Let us handle your Revit drafting

Send us your documents and drawing conventions and we will let you know within one to two working days what we can take on and when.

Small first assignment welcome No subscription NDA on request
info@outsourcecad.nl +31 (0) 651924055
Need Revit drafting done? Reply within 1 to 2 working days. Book a call Call now